{"product_id":"2020-yili-insaat-birim-fiyat-analizleri_351100-html","title":"2020 CONSTRUCTION UNIT PRICE ANALYSES","description":"\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eThis book contains the analysis breakdowns of construction unit prices derived for 2020 from the 2020 General Price Analyses of the Ministry of Environment and Urbanization. \u003cbr\u003eThe basic principles in this entirely computer-generated information, valid from January 1, 2020, are the definitions, measurements, and prices of the Ministry.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eIn the calculations; in Article 39 of the Public Procurement Communiqué dated 22.08.2009\/27327 of the Public Procurement Authority:\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003col open=\"\" sans=\"\" style=\"padding: 0px; margin-right: 0px; margin-bottom: 10px; margin-left: 25px; color: rgb(101, 101, 101); font-family: \"\u003e\n\n\u003cli style=\"line-height: 1.6em; text-align: justify;\"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eIn the unit price bid schedule, the prices offered for work items and the current prices in the analyses shall be written rounded to two decimal places.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/li\u003e\n\n\u003cli style=\"line-height: 1.6em; text-align: justify;\"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eIn the Unit Price schedule, the amount obtained by multiplying the quantity of each work item by the unit price offered for that work item, and in the Analyses, the amount obtained by multiplying each input quantity by its current value, shall be written by rounding to the nearest two decimal places, and these written amounts shall be summed.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/li\u003e\n\n\u003cli style=\"line-height: 1.6em; text-align: justify;\"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eBidders who make arithmetical errors in multiplication and summation in unit price bid schedules will be excluded from evaluation. It is stated.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eThe Unit Price Analysis Calculations in our book also, just like in the Communiqué, the amount obtained by multiplying each input quantity by the current prices has been brought to the nearest two decimal places, summed vertically without profit, and then multiplied by a 1.25 profit margin to arrive at the profitable overall net result.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eHowever, it is observed that due to rounding, the totals of Type 1-2-3-4 Material Labor, Machine Profitable Intermediate Groups do not exactly match the overall net result obtained with this profit margin by 1-2 kurus. This situation is normal and should not be considered an arithmetic error. Accordingly, our book, in two volumes, will serve as a precedent and aid in price determination research for thousands of construction work items.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003ePrice difference calculation examples have been provided and updates included. The required TÜİK Index Series by year are presented in a separate section. At the same time, our book serves as an information system, incorporating price inputs. To find which manufacturing unit price item labor, machine, and material positions are included in, it is sufficient to refer to the Current Price-Input List. In final accounts and progress payment arrangements, transitioning to unit price positions (unit manufacturing) has become easier.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eAnalysis is essentially a synthesis. It has become possible to easily move from general to specific (analysis) and from specific to general (synthesis). Humans acquire learning only by performing analysis and synthesis.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eWith the new law, the Lump Sum Turnkey and Unit Price Bid System has been adopted. Price differences, updates, and indexes are shown with examples at the end of the book.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eOur book will be helpful in calculating approximate construction costs, progress payments, unit price bid analyses, and regarding the construction technique of the work, by whole, by work group, by work item, and by material.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eSince the book has many pages, it is presented in 2 volumes to prevent disorganization. Some parts of the sample applications (CONSTRUCTION APPLICATIONS PROGRESS PAYMENT – QUANTITY SURVEY) have been compiled in a separate book with application methods and three-dimensional descriptive definitions. Errors found in field applications are included in our book.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\u003cp open=\"\" sans=\"\" style=\"margin-right: 0px; margin-left: 0px; color: rgb(101, 101, 101); font-family: \"\u003e\u003cspan style=\"font-size: 11pt;\"\u003e\u003cspan style=\"font-family: Calibri, sans-serif;\"\u003e\u003cstrong style=\"font-weight: bold;\"\u003e\u003cspan style=\"font-size: 10.5pt;\"\u003e\u003cspan style=\"font-family: Arial, sans-serif;\"\u003eWith this book, prepared and developed for application in the service of our construction sector, which is the driving force of our development, the Valid Price Analysis System in construction works is presented collectively, comprehensively, and easily usable in an organized manner.\u003c\/span\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"Ünal Akçalı","offers":[{"title":"Default Title","offer_id":39408987570371,"sku":"9786058083912","price":500.0,"currency_code":"TRY","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0523\/3950\/7395\/products\/9786058083912.jpg?v=1616017703","url":"https:\/\/yemkitabevi.com\/en-us\/products\/2020-yili-insaat-birim-fiyat-analizleri_351100-html","provider":"YEM Kitabevi","version":"1.0","type":"link"}