Construction Applications Payment Claim Bill of Quantities
Yazar: Ünal Akçalı
Brand: Ünal Akçalı
Basım Tarihi: Nisan 2021
Basım Dili:
Sayfa Sayısı: 804Boyut: 20.0 x 28.0 cm
Out Of Stock
9786058083936
Product Description
This expanded 4th edition of our book explains the principles of Quantity Surveying, Payment Certificate Preparation, and Price Difference Calculation with examples, in a guiding and easily understandable manner. Practical information is included, and the book has been enriched with three-dimensional drawings and updated to be application-oriented.
In our country, construction materials have definitions and standards for their market prices. However, there is not enough definition for construction manufacturing in our country. The tolerance of standardized materials is known. But there is no tolerance for manufacturing processes carried out with standardized materials.
The book has been prepared with a practical application focus. Errors made on construction sites are explained as much as possible with definitions and drawings.
The following information is superficially taught in our schools. However, our colleagues who are new to the profession encounter various problems. A tender will be held, an approximate cost, quantity survey, price difference, new unit price, and payment certificate will be prepared, and a project will be read. Manufacturing processes will be defined. This book aims to fill this gap in our country.
March 2021
BOOK SECTIONS
1. TRANSPORTATION
2. PREPARATION
3. BLANK PAYMENT CERTIFICATE FORMS
4. ROOM LIST
5. APPROXIMATE COST
6. QUANTITY SURVEY (EXCAVATION WORKS)
7. QUANTITY SURVEY (IRON WORKS)
8. MACHINE HOURLY RATES
9. PRACTICAL EXAMPLES WITH QUANTITY SURVEYS
10. PAYMENT CERTIFICATE FOR TURNKEY LUMP SUM WORKS
11. PAYMENT CERTIFICATE FOR UNIT PRICE WORKS
12. PRICE DIFFERENCES AND EXPLANATIONS (EXAMPLE SOLUTIONS)
13. PROJECT COST CALCULATION (EXAMPLE)
14. UPDATES
15. MEASUREMENT AND CONSTRUCTION APPLICATIONS ON COASTS
16. VARIOUS PRACTICAL DETAIL PROJECTS
16.1. Doors
16.2. Roofs
16.3. Stairs
17. EXAMPLE CALCULATION OF EXCELLENCE FEES
18. SUPPORTING INFORMATION